ISO 9001:2015 Clause 4.3 Determining the scope of the quality management system


PLAN

DO

CHECK

ACT

 

Clause 4.3 Breakdown

 

4.3     Determining the scope of the quality management system

 

In regards to QMS “…What do we control, what can we influence…”

 

The scope should not be used to exclude parts of the organization which may struggle to achieve accreditation. The organization should also not use clause 4.3 to banish those activities, products, services or functions that have the potential to impact on QMS performance, or are likely to place legal or contractual requirements outside of the accredited quality management system.  The standard makes no specific mention of “Exclusions,” and uses the term "Applicaibility" (Annex A.5) when references the scope of an organization's quality management system

 

Before an organization finalizes the scope of its quality management system, it makes sense that the requirements of clause 4.1 ‘Understanding the organization and its context’, and clause 4.2 ‘understanding the needs and expectations of interested parties’ have been established and utilised in the evolution of the scope.

 

The standard itself states:

 

when determining this scope, the organization shall consider;

 

a) the internal and external issues referred to in 4.1

 

b) the requirements of relevant interested parties referred to in 4.2

 

c) the products and services of the organization

 

The scope of the organizations quality management system should include activities that impact on quality performance that are under its control or influence. That said, the organization may decide to limit the scope of its quality management system to a specific site, location, department or function. Typically it maybe that the organization is running a pilot project on a smaller scale before attempting wider accreditation: In this case the rest of the organization would be considered an external provider or interested party.

 

It should be noted that clause 4.3 is required to be kept as documented information, in whichever format the organization deems suitable: e.g. paperwork, digital file, visual representation (flowchart, process-map, mind-map). Whichever format is used, it needs to be made available to interested parties.

 

Should the organisation consider some clauses of the standard are outside the scope of their quality management system i.e. not applicable, the following is an example of how this maybe addressed within the documented information required for the QMS scope.

 

Clause 8.3 – design and development of products and services
the organisation does not undertake design and development work.

 

Clause 7.1.5.2 – measurement traceability
the organisation does not provide any products or services where measurement traceability is a requirement.

 

 

 

9001:2015 4.3 Determining the scope of the quailty management system

 

 

Useful integrated management system cross references

 

ISO 14001-2015 4.3 - Determining the scope of the environmental management system

ISO 45001-2018 4.3 - Determining the scope of the OH&S management system


On Safe Lines QHSE Software Help file v1.071.0092 : Copyright © 2018 Brian G. Welch MSc(QHSE), NVQ4(OH&S), CMIOSH


FREE H&S Risk Assessment Software
by On Safe Lines QHSE Software

click <here> to learn more